LIFE22-CET-EPBD.wise
Effective implementation of the EPBD in line with short-term and long-term policy requirements
Informazioni Generali
- Coordinatore:
- UNIV. TECHNICAL WIEN (Austria)
- Responsabile:
- ZANGHIRELLA FABIO - DUEE-SAIP-PRE (SALUGGIA)
- Ruolo ENEA:
- PARTNER
- Sito WEB:
- https://www.bpie.eu/epbdwise/
Programmi Europei
- Programma:
- Other programmes (2021-2027) -> LIFE27 (2021-2027) (LIFE ProJect Grants)
Descrizione e Attività
Descrizione Generale
Energy and climate targets require a radical increase in efforts for implementing and strengthening policies in the building sector. The
proposal for a revised EPBD introduced several elements to reach these goals e.g., zero-emission buildings (ZEB), national building
renovation plans (NBRP), minimum energy performance standards (MEPS). Other instruments are strengthened: building renovation
passports (BRP) and energy performance certificates (EPC). Recent developments (gas/energy/economic crises) have triggered shortterm
actions and objectives, leaving Member States (MS) with the challenging task to find solutions to implement them all at once and
avoid lock-in effects. The project will achieve three objectives: 1) Support public authorities in six MS (focus countries) in the design,
implementation and evaluation of instruments (re-) defined in the proposal of the EPBD (ZEB, NBRP, MEPS, BRPs, EPCs) 2) Adopt
a consistent approach for the implementation of building policies stemming from the EPBD recast and use synergies with Fitfor55 and
other EU strategies 3) Build a replicable model to support the implementation of EU legislation by closely engaging with CA-EPBD,
network agencies, and national partners of the Renovate Europe Campaign as well as policy makers and stakeholders. We will analyse
national examples, provide support and technical advice and develop tailored policy packages and tools adapted to the specific needs
of focus countries. These will include guidelines on how to design policies and instruments, measure their effectiveness (monitoring,
reporting and policy evaluation) and adjust to EU and national needs and objectives. The project will establish an intensive stakeholder
engagement in focus countries, including policy fora and bilateral exchanges with implementing bodies. Selected activities and results
will be provided to focus countries; replication and adaptation to EU-27 will be assured through a series of workshops at EU level.
Attività svolta da ENEA
L’ENEA partecipa al WP1 di coordinamento ed è leader del Task 2.1, che si occuperà di investigare il concetto di “zero emission building” (ZEB).
Partecipa anche ai seguenti work package:
WP 3 (Minimum Energy Performance Standards);
WP4 (Building Renovation Passport – per il monitoraggio dei policy needs, l’elaborazione di soluzioni per l’implementazione ed il monitoraggio nei Focus Country e per la realizzazione di linee guida per la replicabilità in altri Paesi membri UE;
WP5 (Energy Performance Certificates): gruppo di lavoro policy needs e status quo degli EPC;
WP6 per verificare e garantire che le soluzioni di policy individuate nei WP 2-5 siano coerenti ed armonizzate tra loro.
WP7 (coinvolgimento degli stakeholder e comunicazione e disseminazione).