INTERPLAN

INTEgrated opeRation PLAnning tool towards the Pan-European Network

Informazioni Generali

Coordinatore:
ENEA (Italia)
Responsabile:
GRADITI GIORGIO - DIRETTORE GENERALE (SEDE)
Ruolo ENEA:
COORD
Sito WEB:
Sito WEB non disponibile

Programmi Europei

Programma:
HORIZON 2020 -> Energy (RIA - Research and Innovation Action)

Descrizione e Attività

Descrizione Generale

The European Union (EU) energy security policy faces significant challenges, as we move towards a pan–European network based on the wide diversity of energy systems among EU members. In such a context, novel solutions are needed to support the future operation of the EU electricity system in order to increase security of supply also accounting for the increasing contribution of renewable energy sources. The goal of INTERPLAN project is to provide an INTEgrated opeRation PLANning tool towards the pan-European network, to support the EU in reaching the expected low-carbon targets, while maintaining network security. A methodology for proper representation of a “clustered” model of the pan-European network will be provided, with the aim to generate grid equivalents as a growing library able to cover all relevant system connectivity possibilities occurring in the real grid, by addressing operational issues at all network levels (transmission, distribution and TSOs-DSOs interfaces). In this perspective, the chosen top-down approach will actually lead to an ""integrated"" tool, both in terms of voltage levels, going from high voltage down to low voltage up to end user, and in terms of building a bridge between static, long-term planning and considering operational issues by introducing controllers in the operation planning. Proper cluster and interface controllers will be developed to intervene in presence of criticalities, by exploiting the flexibility potentials throughout the grid. The achievement of the project goal will be ensured by the subdivision of the needed steps in seven Work Packages, each of them, with a specific measurable objective. The project is in line with the Work Programme, in ensuring more flexibility and active involvement of all stakeholders, and a close coordination of TSOs and DSOs. Moreover, its versatility in the concept of grid equivalents, will allow an accurate analysis of the complex network, by considering local active elements in the grid.

Attività svolta da ENEA

L'ENEA coordina il progetto, svolgendo attività nei seguenti Work package:
WP1: coordination and project management
WP2: technical assessment and regulatory status of the European electricity grid
WP3: requirements, scenarios and use cases definition
WP4: grid equivalenting
WP5: operation planning and semi-dynamic simulation
WP6: INTERPLAN model validation and testing
WP7: dissemination, communication and exploitation

Dati Finanziari (in euro)

Costo Eleggibile

Progetto:
2.964.363,00
ENEA:
556.075,00

Contributo

Progetto:
2.964.363,00
ENEA:
556.075,00

Durata del Progetto

Anno di stipula e Durata:
2017 - 39 mesi
Periodo:
01-11-2017 -> 31-01-2021

Partner (6)

Ruolo Nome Nazione
AIT - AUSTRIAN INSTITUTE OF TECHNOLOGY Austria
UNIV. CYPRUS Cipro
EUROPEAN DISTRIBUTED ENERGY RESOURCES LABORATORIES E.V. Germania
FHG - FRAUNHOFER GESELLSCHAFT ZUR FOERDERUNG DER ANGEWANDTEN FORSCHUNG E.V. Germania
IEN INSTITUTE OF POWER ENGINEERING Polonia
COORD ENEA Italia

Keyword CORDIS (2)

Keyword Argomento
OTHER ENERGY TOPICS Energy
SCIENTIFIC RESEARCH RTD Horizontal Topics

Altre Keyword (1)

Keyword
Smart grid