Descrizione:

SAFE TUNNEL main objective is to contribute to reduce the overall number of accidents inside road tunnels through preventive safety measures. Great attention will be paid to achieve a dramatic decrease of the "fire accidents". Concretely the project aim is to introduce measures capable of introducing in the Frejus area a reduction of the number of HGV incidents by 40% within 10 years and to decrease by 50% the frequency of fires in tunnels within 6 years. Basic ideas are to increase the knowledge of the vehicle status in order to avoid the access into the tunnel to those vehicles with detected or imminent on-board anomalies and to introduce measures to achieve the control of the speed of the vehicles. To fulfil these ideas, SAFE TUNNEL aims to achieve a high integration of on-board vehicle devices and the relevant infrastructures. This vehicle-infrastructure integration shall be achieved at three levels: Check of on-board devices to detect/predict anomalies and the relevant information transmission to the control centre; Control of the access inside tunnel and management of the communication vehicle-infrastructure; Control of the speed inside tunnel by vehicle telecontrol and a moving spot light system. Objectives: Basic ideas are to avoid the access into the tunnel to those vehicles with detected or imminent on-board anomalies and to introduce measures to achieve the control of the speed of the vehicles inside tunnel. Work specific objectives include: Development of two demonstrator trucks equipped with preventive diagnosis devices, tele control and HMI facilities; Development of the control centre to manage SAFE TUNNEL applications; Analysis of the needs of tunnel operator for managing safety related operations with electronic devices; Analysis of driver requirements for an effective on-board Human Machine Interface; Transmission of data in the Frejus area (tunnel included) by a public telecom network (GSM/UMTS)- Demonstrations of SAFE TUNNEL concept by field tests at Frejus Tunnel; Evaluation activities include: Technical & Impact analysis, User acceptance evaluation, Socio-economic impact estimation & Cost Benefit analysis; Recommendations for Standardisation bodies.


Attività svolta da ENEA:

L'ENEA coordina i task relativi alle attività di valutazione tecnica del sistema dimostrativo di monitoraggio, controllo e gestione della sicurezza nei tunnel e alla attività di standardizzazione. Partecipa inoltre ai task per l'analisi delle esigenze dell'utilizzatore e la specificazione dei requisiti del sistema, per la definizione dell'architettura del sistema, per la specificazione del progetto del sistema e la disseminazione dei risultati.


Note:


Posizione:
672

Codice Atto:


Atto di approvazione ENEA:
11/2001/ING

Unità alla stipula:
ING

Costo eleggibile del Progetto: 4.943.000,00

Contributo al Progetto: 2.223.000,00



Costo eleggibile per ENEA: 193.400,00

Contributo ad ENEA: 96.679,00

Anno di stipula:
2001

Durata in mesi:
0

Data di inizio:
01-09-2001

Data di scadenza:
31-08-2004


Indice                               Costo Tot. Contr. UE
               
0 CENTRO RICERCHE FIAT Istituti di ricerca Italia COORD
1 ENEA Istituti di ricerca Italia PARTNER

 Argomento  Macro Key  Keyword


Nessuna Keyword specificata per il Progetto selezionato



 Indice


Nessun altro indice specificato per il Progetto selezionato