Banca Dati PROGETTI UE





 

DETTAGLI PROGETTO  LEADER
(Num. 249668)


Num. Contratto:
249668

Coordinatore: ANSALDO NUCLEARE SPA (Italia)

Responsabile ENEA: GRASSO GIACOMO - NUC-ENER-PRO (BO-MARTIRI MONTE SOLE)

Ruolo ENEA: PARTNER

Sito Web: http://www.leader-fp7.eu

Programma Quadro: Settimo Programma Quadro Euratom (2007-2013)

Programma UE: Euratom fissione - Fissione nucleare e radioprotezione

Area Tematica: Energy - fission security

Tipo Progetto: CP-FP - Progetto di collaborazione-progetto mirato

Descrizione:

The LEADER proposal deals with the development to a conceptual level of a Lead Fast Reactor Industrial size plant and of a scaled demonstrator of the LFR technology. The proposal is based on previous achievements obtained during the 6th FP of the EU in the ELSY project but takes into account the indications emerged from the European Strategic Research Agenda as well as the main goals of the European Industrial Initiative on Fission. As a consequence the project is strongly committed to the conceptual design of a scaled/pilot plant to be constructed in the relatively short term. The focus of the first part of activity will be the resolutions of the key issues emerged in the frame of the ELSY project to reach a new reference reactor configuration. This updated reactor configuration of an industrial size LFR will be used to design a low cost and fully representative scaled down prototype of a suitable size. The project foresee an important involvement of End-Users and Safety Authorities from the beginning of the design process to help the plant conception and to assure high safety standards. Education and Training activities are included in a specific work package where European Universities are directly involved with the aim to grow-up the future nuclear energy designer. The LEADER projects takes strongly into account the others already proposed or on-going EU projects. All projects dedicated to R&D and material developments, projects dedicated to the development of ADS systems for transmutation or related to the development of fast reactors (VELLA, CDT, CP-ESFR, GETMAT, FAIRFUELS, ACSEPT, EUFRAT, F-BRIDGE, ACSEPT, ACTINET-I3, THINS) have strong synergies with LEADER toward the development of a Lead cooled fast reactor system. The project Partners are convinced that fostering the European efforts towards a LFR demonstration/pilot plant realization would be very beneficial, will speed up the development needed and establish Europe as a leader in this field.


Attività svolta da ENEA:

L'ENEA partecipa ai seguenti Work packages: WP 1: Refrence design objectives and specification WP 2: Core design (coordinato da ENEA) WP 3: Conceptual design WP 4: Plant Operation, instrumentation, control and protection system design WP 5: Safety and transient analysis WP 6: Lead technology


Note:


Posizione:
1139

Codice Atto:
IO050

Atto di approvazione ENEA:
402/2010/COMM

Unità alla stipula:
UTFISSM

Costo eleggibile del Progetto: 5.688.185,00

Contributo al Progetto: 2.994.088,00



Costo eleggibile per ENEA: 740.000,00

Contributo ad ENEA: 370.000,00

Anno di stipula:
2010

Durata in mesi:
36

Data di inizio:
02-04-2010

Data di scadenza:
30-09-2013


Indice                               Costo Tot. Contr. UE
               
0 SCK CEN - STUDIECENTRUM VOOR KERNENERGIE / CENTRE D'ETUDE DE L'ENERGIE NUCLEAIRE Istituti di ricerca Belgio
1 CEA - COMMISSARIAT A L'ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVES Istituti di ricerca Francia
2 KIT - KARLSRUHER INSTITUTE OF TECHNOLOGY Università Germania
3 ANSALDO NUCLEARE SPA Istituti di ricerca Italia COORD
4 CIRTEN - CONSORZIO INTERUNIVERSITARIO PER LA RICERCA TECNOLOGICA NUCLEARE Istituti di ricerca Italia
5 ENEA Istituti di ricerca Italia PARTNER
6 S.R.S. SERVIZI DI RICERCHE E SVILUPPO SRL Industrie Italia
7 UNIV. BOLOGNA ALMA MATER STUDIORUM Università Italia
8 JRC COMMISSION OF THE EUROPEAN COMMUNITIES Istituti di ricerca Organ. Internazionali
9 NRG - NUCLEAR RESEARCH AND CONSULTANCY GROUP Istituti di ricerca Paesi Bassi
10 UNIV. OF SCIENCE AND TECHNOLOGY (AGH) Università Polonia
11 UJV REZ a.s. - USTAV JADERNEHO VYZKUMU REZ A.S. Istituti di ricerca Repubblica Ceca
12 RATEN - REGIA AUTONOMA PENTRU ACTIVITATI NUCLEARE Istituti di ricerca Romania
13 EMPRESARIOS AGRUPADOS INTERNACIONAL SA Industrie Spagna
14 KTH - ROYAL INSTITUTE OF TECHNOLOGY Università Svezia
15 PSI - PAUL SCHERRER INSTITUTE Istituti di ricerca Svizzera

 Argomento  Macro Key  Keyword
Energy NUCLEAR FISSION NUCLEAR FISSION
Protecting Man and his Environment SAFETY SAFETY

 Indice


Nessun altro indice specificato per il Progetto selezionato