Banca Dati PROGETTI UE





 

DETTAGLI PROGETTO  INTERPLAN
(Num. 773708)


Num. Contratto:
773708

Coordinatore: ENEA (Italia)

Responsabile ENEA: GRADITI GIORGIO - TERIN (SEDE)

Ruolo ENEA: COORD

Sito Web: Sito WEB non disponibile

Programma Quadro: HORIZON 2020

Programma UE: Energy - Secure, Clean and Efficient Energy

Area Tematica: Energy - smart grids

Tipo Progetto: RIA - Research and Innovation Action

Descrizione:

The European Union (EU) energy security policy faces significant challenges, as we move towards a pan–European network based on the wide diversity of energy systems among EU members. In such a context, novel solutions are needed to support the future operation of the EU electricity system in order to increase security of supply also accounting for the increasing contribution of renewable energy sources. The goal of INTERPLAN project is to provide an INTEgrated opeRation PLANning tool towards the pan-European network, to support the EU in reaching the expected low-carbon targets, while maintaining network security. A methodology for proper representation of a “clustered” model of the pan-European network will be provided, with the aim to generate grid equivalents as a growing library able to cover all relevant system connectivity possibilities occurring in the real grid, by addressing operational issues at all network levels (transmission, distribution and TSOs-DSOs interfaces). In this perspective, the chosen top-down approach will actually lead to an ""integrated"" tool, both in terms of voltage levels, going from high voltage down to low voltage up to end user, and in terms of building a bridge between static, long-term planning and considering operational issues by introducing controllers in the operation planning. Proper cluster and interface controllers will be developed to intervene in presence of criticalities, by exploiting the flexibility potentials throughout the grid. The achievement of the project goal will be ensured by the subdivision of the needed steps in seven Work Packages, each of them, with a specific measurable objective. The project is in line with the Work Programme, in ensuring more flexibility and active involvement of all stakeholders, and a close coordination of TSOs and DSOs. Moreover, its versatility in the concept of grid equivalents, will allow an accurate analysis of the complex network, by considering local active elements in the grid.


Attività svolta da ENEA:

L'ENEA coordina il progetto, svolgendo attività nei seguenti Work package: WP1: coordination and project management WP2: technical assessment and regulatory status of the European electricity grid WP3: requirements, scenarios and use cases definition WP4: grid equivalenting WP5: operation planning and semi-dynamic simulation WP6: INTERPLAN model validation and testing WP7: dissemination, communication and exploitation


Note:


Posizione:
1490

Codice Atto:
PT2AAK

Atto di approvazione ENEA:
42/E/2017/DTE

Unità alla stipula:
DTE-FSN-FOSG

Costo eleggibile del Progetto: 2.964.363,00

Contributo al Progetto: 2.964.363,00



Costo eleggibile per ENEA: 556.075,00

Contributo ad ENEA: 556.075,00

Anno di stipula:
2017

Durata in mesi:
39

Data di inizio:
01-11-2017

Data di scadenza:
31-01-2021


Indice                               Costo Tot. Contr. UE
               
0 AIT - AUSTRIAN INSTITUTE OF TECHNOLOGY Istituti di ricerca Austria
1 UNIV. CYPRUS Università Cipro
2 EUROPEAN DISTRIBUTED ENERGY RESOURCES LABORATORIES E.V. Istituti di ricerca Germania
3 FHG - FRAUNHOFER GESELLSCHAFT ZUR FOERDERUNG DER ANGEWANDTEN FORSCHUNG E.V. Istituti di ricerca Germania
4 ENEA Istituti di ricerca Italia COORD
5 IEN INSTITUTE OF POWER ENGINEERING Istituti di ricerca Polonia

 Argomento  Macro Key  Keyword
Energy OTHER ENERGY TOPICS OTHER ENERGY TOPICS
RTD Horizontal Topics SCIENTIFIC RESEARCH SCIENTIFIC RESEARCH

 Indice
Smart grid